Newsletter Subject
From
military.com
Email Address
do_not_reply@ei1.email.military.com
Sent On
Thu, Jun 10, 2021 10:39 AM
Daily Brief 10 June 2021 Boeing Co. is behind schedule on two new Air Force One aircraft. More Milit
Subject Line Length
Data shows that subject lines with 6 to 10 words generated 21 percent higher open rate.
Average in this category
Number of Words
The more words in the content, the more time the user will need to spend reading. Get straight to the point with catchy short phrases and interesting photos and graphics.
Average in this category
Number of Images
More images or large images might cause the email to load slower. Aim for a balance of words and images.
Average in this category
Time to Read
Longer reading time requires more attention and patience from users. Aim for short phrases and catchy keywords.
Average in this category
Predicted open rate
Spam Score
Spam score is determined by a large number of checks performed on the content of the email. For the best delivery results, it is advised to lower your spam score as much as possible.
Flesch reading score
Flesch reading score measures how complex a text is. The lower the score, the more difficult the text is to read. The Flesch readability score uses the average length of your sentences (measured by the number of words) and the average number of syllables per word in an equation to calculate the reading ease. Text with a very high Flesch reading ease score (about 100) is straightforward and easy to read, with short sentences and no words of more than two syllables. Usually, a reading ease score of 60-70 is considered acceptable/normal for web copy.
Technologies
What powers this email? Every email we receive is parsed to determine the sending ESP and any additional email technologies used.
Email Size (not include images)
No. | Font Name |
![]() Subscribe Now |